{"id":29037,"date":"2024-02-23T08:05:06","date_gmt":"2024-02-23T08:05:06","guid":{"rendered":"https:\/\/trinetratimes.in\/?p=29037"},"modified":"2024-02-23T08:05:06","modified_gmt":"2024-02-23T08:05:06","slug":"prime-minister-to-dedicate-stage-i-2x800-mw-of-ntpcs-lara-super-thermal-power-station-and-lay-foundation-stone-of-stage-ii-2x800-mw-of-ntpcs-lara-super-thermal-power-pr","status":"publish","type":"post","link":"https:\/\/trinetratimes.in\/?p=29037","title":{"rendered":"Prime Minister to dedicate Stage-I (2\u00d7800 MW) of NTPC\u2019s Lara Super Thermal Power Station and lay foundation stone of Stage-II (2\u00d7800 MW) of NTPC\u2019s Lara Super Thermal Power Project in Chhattisgarh"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-29038\" src=\"https:\/\/trinetratimes.in\/wp-content\/uploads\/2024\/02\/Screenshot_2024-02-23-13-30-20-40_439a3fec0400f8974d35eed09a31f914-300x155.jpg\" alt=\"\" width=\"300\" height=\"155\" srcset=\"https:\/\/trinetratimes.in\/wp-content\/uploads\/2024\/02\/Screenshot_2024-02-23-13-30-20-40_439a3fec0400f8974d35eed09a31f914-300x155.jpg 300w, https:\/\/trinetratimes.in\/wp-content\/uploads\/2024\/02\/Screenshot_2024-02-23-13-30-20-40_439a3fec0400f8974d35eed09a31f914-768x396.jpg 768w, https:\/\/trinetratimes.in\/wp-content\/uploads\/2024\/02\/Screenshot_2024-02-23-13-30-20-40_439a3fec0400f8974d35eed09a31f914-150x77.jpg 150w, https:\/\/trinetratimes.in\/wp-content\/uploads\/2024\/02\/Screenshot_2024-02-23-13-30-20-40_439a3fec0400f8974d35eed09a31f914-696x359.jpg 696w, https:\/\/trinetratimes.in\/wp-content\/uploads\/2024\/02\/Screenshot_2024-02-23-13-30-20-40_439a3fec0400f8974d35eed09a31f914.jpg 966w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><br \/>\n<strong>Trinetra Times<\/strong>\u00a0 New Delhi, 23rd February, 2023: Hon\u2019ble Prime Minister Shri Narendra Modi will dedicate Stage-I (2\u00d7800 MW) of NTPC\u2019s Lara Super Thermal Power Station and lay foundation stone of Stage-II (2\u00d7800 MW) of NTPC\u2019s Lara Super Thermal Power Project through video-conferencing on 24th February 2024.<\/p>\n<p>While Stage-I of the station is built with an investment of approximately Rs 15,800 crore, the Stage-II of the project shall be constructed on the available land of Stage-I, thus requiring no additional land for the expansion, and entails an investment of Rs 15,530 crore.<\/p>\n<p>Located in Raigarh district of Chhattisgarh, coal for this pit-head power station\/project will be supplied from NTPC\u2019s Talaipalli Coal block through Merry-Go-Round (MGR) system, ensuring supply of low-cost power with 24\u00d77 availability to the country.<\/p>\n<p>Equipped with highly-efficient Super Critical technology (for Stage-I) and Ultra Super Critical technology (for Stage-II), all the units will ensure lesser Specific Coal Consumption and Carbon-Dioxide emission.<\/p>\n<p>While 50% power from both Stage-I &amp; II is allocated to the state of Chhattisgarh, the project will play a crucial role in improving power scenario in several other states, such as Gujarat, Madhya Pradesh, Maharashtra, Goa, Daman &amp; Diu, Dadra and Nagar Haveli.<\/p>\n<p>Meanwhile, installation of this project is creating direct and indirect employment opportunities in the region. Besides various Community Development initiatives are being taken up by NTPC in the nearby areas in the field of education, drinking water, sanitation, health and women empowerment.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Trinetra Times\u00a0 New Delhi, 23rd February, 2023: Hon\u2019ble Prime Minister Shri Narendra Modi will dedicate&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[17,6,20,22,5,23,7,24,25,9,26,27,28,336,29,4,30,32,8,36,37,38,40,41,46],"tags":[],"class_list":["post-29037","post","type-post","status-publish","format-standard","hentry","category-17","category-6","category-20","category-22","category-5","category-23","category-7","category-24","category-25","category-9","category-26","category-27","category-28","category-336","category-29","category-4","category-30","category-32","category-8","category-36","category-37","category-38","category-40","category-41","category-46"],"_links":{"self":[{"href":"https:\/\/trinetratimes.in\/index.php?rest_route=\/wp\/v2\/posts\/29037","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/trinetratimes.in\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/trinetratimes.in\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/trinetratimes.in\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/trinetratimes.in\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=29037"}],"version-history":[{"count":1,"href":"https:\/\/trinetratimes.in\/index.php?rest_route=\/wp\/v2\/posts\/29037\/revisions"}],"predecessor-version":[{"id":29039,"href":"https:\/\/trinetratimes.in\/index.php?rest_route=\/wp\/v2\/posts\/29037\/revisions\/29039"}],"wp:attachment":[{"href":"https:\/\/trinetratimes.in\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=29037"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/trinetratimes.in\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=29037"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/trinetratimes.in\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=29037"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}